# | Parameter | Cost | Lab |
---|---|---|---|
1 | Construction | 20,000/= | Materials Lab |
2 | Internal Diameter | 20,000/= | Materials Lab |
3 | Maximum increase in volume of test piece | 20,000/= | Materials Lab |
4 | Types of hose and hose assembly | 20,000/= | Materials Lab |
Sub Total: | 80,000/= | ||
Laboratory Fee: | 10,000/= | ||
Total: | UGX 90,000/= |