# | Parameter | Cost | Lab |
---|---|---|---|
1 | Backing of the basic filling and for prebuilt borders | 60,000/= | Materials Lab |
2 | Classes | 20,000/= | Materials Lab |
3 | Construction | 80,000/= | Materials Lab |
4 | Corrosion resistance | 20,000/= | Materials Lab |
5 | Edge frame | 20,000/= | Materials Lab |
6 | Edge frame joints | 20,000/= | Materials Lab |
7 | Number of interlinked formed-wire springing | 20,000/= | Materials Lab |
8 | Overall dimensions | 20,000/= | Materials Lab |
9 | Prebuilt borders | 20,000/= | Materials Lab |
10 | Steel diameter | 20,000/= | Materials Lab |
Sub Total: | 300,000/= | ||
Laboratory Fee: | 10,000/= | ||
Total: | UGX 310,000/= |