1 | Abnormal operation | 18,000/= | Electrical Lab |
2 | Appliance classification | 12,000/= | Electrical Lab |
3 | Clearances, creepage distances and solid insulation | 15,000/= | Electrical Lab |
4 | Components requirements check | 12,000/= | Electrical Lab |
5 | Constructional requirements | 21,000/= | Electrical Lab |
6 | Functional tests | 30,000/= | Electrical Lab |
7 | Heating | 18,000/= | Electrical Lab |
8 | Internal wirings | 12,000/= | Electrical Lab |
9 | Leakage current and electric strength test | 24,000/= | Electrical Lab |
10 | Marking and instructions requirements | 18,000/= | Electrical Lab |
11 | Mechanical strength | 30,000/= | Electrical Lab |
12 | Overload protection of associated transformers and accessories | 18,000/= | Electrical Lab |
13 | Power input and current | 21,000/= | Electrical Lab |
14 | Protection against access to live parts | 21,000/= | Electrical Lab |
15 | Provision for earthing | 18,000/= | Electrical Lab |
16 | Resistance to heat and fire | 12,000/= | Electrical Lab |
17 | Resistance to rusting | 12,000/= | Electrical Lab |
18 | Screws and connections | 12,000/= | Electrical Lab |
19 | Stability and mechanical hazards | 21,000/= | Electrical Lab |
20 | Supply connection and external flexible cords | 15,000/= | Electrical Lab |
21 | Terminals for external conductors | 12,000/= | Electrical Lab |
22 | Transient over voltages | 15,000/= | Electrical Lab |
Sub Total: | 387,000/= |
Laboratory Fee: | 10,000/= |
Total: | UGX 397,000/= |