1 | Composition | 30,000/= | Materials Lab |
2 | Compressive strength of Concrete at 28 days | 70,000/= | Materials Lab |
3 | Compressive strength of sandwich panel | 70,000/= | Materials Lab |
4 | Density of Polystyrene | 40,000/= | Materials Lab |
5 | Density of sandwich panel | 40,000/= | Materials Lab |
6 | Dimensions | 20,000/= | Materials Lab |
7 | Finishing | 20,000/= | Materials Lab |
8 | Flexural strength of polystylene | 70,000/= | Materials Lab |
9 | Minimum compression strength with deformation at 10 % | 60,000/= | Materials Lab |
10 | Water absorption | 20,000/= | Materials Lab |
Sub Total: | 440,000/= |
Laboratory Fee: | 10,000/= |
Total: | UGX 450,000/= |