# | Parameter | Cost | Lab |
---|---|---|---|
1 | Construction | 20,000/= | Materials Lab |
2 | Corrosion resistance - Metallic trims and components | 40,000/= | Materials Lab |
3 | Design | 20,000/= | Materials Lab |
4 | Mass of the footwear | 20,000/= | Materials Lab |
Sub Total: | 100,000/= | ||
Laboratory Fee: | 10,000/= | ||
Total: | UGX 110,000/= |