# | Parameter | Cost | Lab |
---|---|---|---|
1 | Angle of pitch | 20,000/= | Materials Lab |
2 | Design and construction | 150,000/= | Materials Lab |
3 | Dimensions | 20,000/= | Materials Lab |
4 | Hand rails - maximum distance | 20,000/= | Materials Lab |
5 | Resistance to foreseeable imposed loads | 40,000/= | Materials Lab |
Sub Total: | 250,000/= | ||
Laboratory Fee: | 10,000/= | ||
Total: | UGX 260,000/= |