# | Parameter | Cost | Lab |
---|---|---|---|
1 | Delay time for shock-tube detonators of different delay periods - QS shock-tube detonator | 80,000/= | Materials Lab |
2 | Initiating power - The hole broken through the aluminium-plate | 60,000/= | Materials Lab |
3 | Length of a shock-tube | 20,000/= | Materials Lab |
4 | Tensile strength | 70,000/= | Materials Lab |
Sub Total: | 230,000/= | ||
Laboratory Fee: | 10,000/= | ||
Total: | UGX 240,000/= |