# | Parameter | Cost | Lab |
---|---|---|---|
1 | Outlet pipe diameter | 20,000/= | Materials Lab |
2 | Rubber hose pipe | 20,000/= | Materials Lab |
3 | The length of main gas pipe | 20,000/= | Materials Lab |
4 | The minimum diameter of the inlet pipe | 20,000/= | Materials Lab |
5 | Water leakage test - The water level shall not drop | 60,000/= | Materials Lab |
Sub Total: | 140,000/= | ||
Laboratory Fee: | 10,000/= | ||
Total: | UGX 150,000/= |