# | Parameter | Cost | Lab |
---|---|---|---|
1 | Delay time for shock-tube detonators of different delay periods -MS 1st - 3rd. series | 80,000/= | Materials Lab |
2 | Initiating power - The hole broken through the aluminium-plate | 60,000/= | Materials Lab |
3 | Length of a shock-tube | 20,000/= | Materials Lab |
4 | Period number | 20,000/= | Materials Lab |
5 | Tensile strength | 70,000/= | Materials Lab |
Sub Total: | 250,000/= | ||
Laboratory Fee: | 10,000/= | ||
Total: | UGX 260,000/= |